General

Welcome to the vote driven support forum. Please submit your ideas for new feature requests. Please only use this to request new features, not to submit bug reports.

To receive email notifications when items are updated you need to register.

Thanks for contributing! :)

/Mats

I suggest you ...

You've used all your votes and won't be able to post a new idea, but you can still search and comment on existing ideas.

There are two ways to get more votes:

  • When an admin closes an idea you've voted on, you'll get your votes back from that idea.
  • You can remove your votes from an open idea you support.
  • To see ideas you have already voted on, select the "My feedback" filter and select "My open ideas".
(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  1. automatic resource scheduling/leveling

    i would love to have a possibility to reschedule my resources or level them automaticly. so you can just reorder a bit of the tasks and let the component do the rest.

    its a feature, that is hardly to find in common project management tools and everybody wants to have it

    23 votes
    Vote
    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      I agree to the terms of service
      Signed in as (Sign out)
      You have left! (?) (thinking…)
    • vertical multi day view

      support for multi day view for multi resources grouped vertically like:

      http://demos.telerik.com/aspnet-ajax/scheduler/examples/resourcegrouping/defaultcs.aspx

      15 votes
      Vote
      Sign in
      Check!
      (thinking…)
      Reset
      or sign in with
      • facebook
      • google
        Password icon
        I agree to the terms of service
        Signed in as (Sign out)
        You have left! (?) (thinking…)
      • Allow different units for assignments (like hours).

        It should be possible to assign resources not only in % but also in other units like hours (maybe coupled to some maximum value).

        Something like having an estimate of hours for a task and assigning resources with hours up to that estimate.

        This would be good for user experience.

        7 votes
        Vote
        Sign in
        Check!
        (thinking…)
        Reset
        or sign in with
        • facebook
        • google
          Password icon
          I agree to the terms of service
          Signed in as (Sign out)
          You have left! (?) (thinking…)
        • allow for "inclusive/exclusive" of end date

          There are two ways to interpret date ranges when dealing with day level gantts. (though I suppose this will work for any schedule that is using a uniform unit of time)

          If you have a date range as follows:

          Start: 12/14/09
          End: 12/14/09

          One way to interpret this is to say that the event is zero days long or to exclude the end date/day from the range. That is currently the way your scheduler works. Because times are not specified they default to the same time and the scheduler thinks the event has no length.

          A second way to interpret…

          3 votes
          Vote
          Sign in
          Check!
          (thinking…)
          Reset
          or sign in with
          • facebook
          • google
            Password icon
            I agree to the terms of service
            Signed in as (Sign out)
            You have left! (?) (thinking…)
          • 3 votes
            Vote
            Sign in
            Check!
            (thinking…)
            Reset
            or sign in with
            • facebook
            • google
              Password icon
              I agree to the terms of service
              Signed in as (Sign out)
              You have left! (?) (thinking…)
            • Export/Import scheduler to google spreadsheets

              Import/Export the scheduler data to google spreadsheets

              2 votes
              Vote
              Sign in
              Check!
              (thinking…)
              Reset
              or sign in with
              • facebook
              • google
                Password icon
                I agree to the terms of service
                Signed in as (Sign out)
                You have left! (?) (thinking…)
                1 comment  ·  Admin →
              • Implement remoteSort, remoteFilter and load for TaskStore to enable complex server-side sorting

                Implement remoteSort, remoteFilter and load for TaskStore to enable complex server-side sorting. These already exist for Store though not for TreeStore. In some cases this saves a vast amount of javascript code when it's not a problem to reload the store.

                1 vote
                Vote
                Sign in
                Check!
                (thinking…)
                Reset
                or sign in with
                • facebook
                • google
                  Password icon
                  I agree to the terms of service
                  Signed in as (Sign out)
                  You have left! (?) (thinking…)
                • Don't see your idea?

                General

                Feedback and Knowledge Base